Bottled Mineral Water Production Line Filling Machine for Sale

Bottled Mineral Water Production Line Filling Machine for Sale

Generation Introduction

This CGF Clean-filling-capping three-in-1unit: Beverage CZPT is utilised to make polyester bottled mineral water, purified h2o, alcoholic beverage machinery and other non-fuel beverage equipment. Beverage CZPT can complete all the procedure such as washing bottle, filling and sealing, it can reduce the materials and Outsiders contact time, improve the sanitary conditions, manufacturing potential and financial effectiveness.
The Full Bottled Mineral H2o / Pure Water Creation Line utilised in the beverage filling operations. The a few features of bottlewash, fill and seal are composed in one particular body of the machine. The entire approach is automatic.
 

Washing heads
The rotary disk is entirely created of SUS304 stainless steel. 
Using imported special effective spray nozzle, the washing drinking water will be sprayed in a certain angle, can wash any component of the internal wall, rinse with drinking water totally and save flush bottle.
Bottle clamp and lifting mechanism of sliding sleeve adopts Germany Igus corrosion resistant bearing CZPT maintenance.
Washing element moves by a body in the transmission program via the equipment transmission.
Filling heads
The washing bottle, filling, sealing are connecting with the thumbwheel card bottleneck transportation techniques.
The rotating disk is all made of SUS304 stainless.
Filling method is fravity filling.
Filling valve manufactured by SUS304.
The filling valve construction layout is realistic, the filling quantity is exact.
Capping heads
The capping equipment is the optimum precision in 3-in-one unit device, on the trustworthiness of gear procedure, has huge influence on the defective charge of the item.Launched the world’s most superior Italian AROL capping equipment technologies, combining with the filling device generation experience enhancement, and inquire university of ZheJiang Jiao Tong university mechanical engineering institute of electrical and mechanical style and automation engineering of specialists and professors to assist design. 

Primary Attributes

1. Making use of the wind sent access and shift wheel in the bottle right related engineering canceled screw and conveyor chains, this permit the change the bottle-formed turn into simpler. 

two. Bottles transmission undertake clip bottleneck technology, bottle-formed change not require to adjust the equipment degree, only alter associated the curved plate, wheel and nylon components is sufficient.. 

three. The specially made stainless steel bottle washing device clip is sound and durable, no touch with the screw area of bottle mouth to avoid secondary air pollution. 

4. Large-speed massive gravity circulation valve filling valve, filling rapidly, filling accurate and no liquid get rid of. 

5. Spiraling decrease when output bottle, change bottle condition no want to alter the top of conveyor chains. 

6. Host adopt advanced PLC automatic handle engineering, the key electrical factors from renowned company this kind of as Japan’s Mitsubishi, France Schneider, OMRON.

More models

Washing, filling, capping heads fourteen-12-4 18-18-6 24-24-eight 32-32-eight
Capacity based on 500ml 3000-4000 BPH 5000-7000 BPH 8000-12000 BPH 12000-15000 BPH
Relevant bottle H=a hundred and seventy-320, Φ=50-100, (330∼2000ml)
Pressure  .25-.three MPA
CZPT power  1.five+.37 KW 2.two+.37 KW three+.45+.twenty five KW four+.45+.25 KW
General dimension 2300×1680×2650 2500×1760×2650 3100×2100×2650 3800×2800×2650
Fat 2600 KG 3500 KG 4800 KG 6500 KG

Auxiliary devices
 

RO water treatment program
We adopt different equipment to produce pure h2o, mineral drinking water and many others. The primary products of RO H2o Treatment method Plant are silica sand filter, lively carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, h2o tank and so on.  It can effectively get rid of muddy natural subject, iron, manganese and so forth, lessen the hardness of the water to make all technical specs of the h2o good quality entirely satisfy the condition refreshing drinking water standard of fresh consume h2o.
Blow molding technique
one. Superb Mechanical Energy, influence-resisting, and non-craking. 
two. Bottle mouth and thread are of exact measurement.
3. CZPT Medication Bottle’s protected thread can be molding right.
four. The dimensions and fat of the merchandise can determine and design and style clearly and satisfy the requirement of the design and style CZPT any deviation. 
5. The surface area of the bottle mouth, neck and the entire body is good luster and smoothness, the normal of bottle entire body is unity. 
6. The joint seam on the bottle body is easy, no scrap rubber. 
Computerized labeling equipment
1. Shrink Labeling Machine For Sleeve adpots PLC programmable controller,imported servo motor,servo driver, frequency converter and transducer.
two. Shrink Labeling Device For Sleeve adopts the positioning module to ensure the casting label precise,quick and steady.
3. Our Shrink Labeling Equipment For Sleeve not only has a highly precise placement for casting label, but also withstand the excellent condition of the bottle after shrinkage.
PE movie packaging equipment
Automatic PE movie warmth shrink wrapping equipment is ideal for wrapping of this kind of items as pop best, mineral water , bottles. beer, drinks and so forth. Functioning with PE film shrink tunnel to pack the merchandise flawlessly , the complete creation approach adopts the Germany sophisticated technics, and the primary elements are imported from global famous businesses. It is composed of seven actuating motor, by means of cooperation with seven actuating motor to type the product packed with plastic movie and many bottles as a team out from the scorching shrinking packing machine.

King Device

CZPTized workshop of total 12,000 sq. meters.
Diverse sorts of processing units, this kind of as drinking water jet cutter, plasma cutter, laser cutter, CNC device from ZheJiang chevalier & korea daewoo, make certain the precision of areas.

CZPT certification, Countrywide Certification of equipment verification, and a lot more than 30 invention patents are carried out in King machine .
Verification Certificates of equipments: CZPT:2001 CE Certificate , SGS , COC , TUV
Countrywide Certificate of equipment verification:regular organisation of Nigeria , CNCA certification, Symbol trademark registration, and many others.

The gear will be tested and operate for 24 several hours before leaving the manufacturing facility, to guarantee the smooth doing work of water pipeline, and pneumatic, electrical and mechnical security.

Sufficient inventory of spare parts ensures the well timed shipping and delivery and source of spare components.

The engineers are knowledgeable. We can make diverse products with diverse capacity and function out reasonable flow chart as per customers’ requirements to help save area.

Skilled set up team who can communicate fluent English can help customers make benefits in a shortest time.

King Machine

1. Installation, debug
Right after products arrived at the workshop of consumer, area the tools in accordance to plane structure we offered. We will arrange seasoned technician for equipment installation, debug and test manufacturing at the identical time make the equipment attain the rated generating ability of the line. The consumer need to supply the spherical tickets and lodging of our engineer, and the wage.

two. Instruction
Our firm supply technology coaching to client. The material of coaching is composition and servicing of tools, manage and procedure of products. Seasoned technician will manual and build instruction define. Following coaching, the technician of consumer could master the operation and maintenance, could modify the approach and deal with distinct failures. 

three. High quality ensure
We promise that our products are all new and not utilised. They’re created of suited content, undertake new style. The quality, specification and perform all meet the desire of contract. We assure that the items of this line could storage for one calendar year CZPT adding any aseptic.

four. Right after revenue
Following examining, we offer 12 months as quality promise, cost-free offer wearing elements and provide other elements at the cheapest price. In quality assure, the technician of buyers should function and preserve the tools in accordance to seller’s desire, debug some failures. If you could not solve the troubles, we will information you by mobile phone if the troubles are even now can not solve, we will arrange technician to your manufacturing unit fixing the difficulties. The value of technician arrangement you could see the expense treatment method of technician. 

Soon after top quality ensure, we offer you engineering support and soon after income provider. Provide putting on components and other spare areas at favorable value after quality guarantee, the technician of consumers should function and preserve the equipment according to seller’s demand, debug some failures. If you could not fix the troubles, we will manual you by phone if the issues are nonetheless can not solve, we will set up technician to your manufacturing facility fixing the problems.

FAQ

Q1: Do you have reference task?
A1: We have reference venture in most nations around the world,If we get the authorization of the customer who has brought the equipment from us ,we can explain to you their contact imformation,you can go to vist their manufacturing unit.
And you are often welcome to occur to pay a visit to our firm,and see the machine running in our manufacturing facility,we can choose you up from the station near our city.
Get in touch with our income individuals you can get video of our reference working equipment

Q2: Do you have agent and right after-service stations?
A2: So significantly we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to be a part of us!

Q3: Do you offer CZPT support
A3: We can style the machines in accordance your specifications(materil ,electrical power,filling kind,the varieties of the bottles,and so on),at the very same time we will give you our expert recommendation,as you know,we have been in this industry for many years.

This fall: What is your assure or the warranty of the good quality if we get your equipment?
A4: We offer you large high quality machines with 1 calendar year promise and provide life-prolonged technical assist.

Q5: How long time for installation?
A5: According your equipment buy,we will send one particular or two engineers to your plant,it will get about ten days to 25 times.

 

Bottled Mineral Water Production Line Filling Machine for Sale